


Botswana PS 1.1 and PS2.1 Bulk Water Supplyupgrade project. GeneralControl andInstrumentation (C&I)
Botswana Water Utilities Corporation (WUC) has identified a need to refurbish the North South Carrier 1 (NSC-1) Pump Stations PS 1.1 (Tender WUC013 of 2017) and PS 2.1(Tender WUC013 of 2017) to enhance efficiency. The main objectives are to upgrade and refurbish the...
Lake Malawi
Design and construction of break pressure tanks and booster pump stations along the 120 kilometer x 1.2 m diameter bulk water pipeline from Lake Malawi to Lilongwe...
Nandoni – Giyani
Bulk pipeline design from Nandoni to Giyani as well as pump station design, RSA
