+2711 318 5065 info@southzambezi.com
A two phased project which included, short term critical emergency works. (Water supply to Nkensani Hospital with installation of water softening plant.) Long term reliable water supply and waste water management. (6 Boreholes were rehabilitated and made operational in Giyani town.
  • Prevent raw sewer overflow from existing Giyani Sewage Treatment Plant to River Klein Letaba.
  • Condition assessment of 154 community boreholes. Refurbishment of 134 of those boreholes and 17 new boreholes in 55 Villages. Design and installation of package water purification plants.
  • Installation of reverse osmosis package plants and electrical transformers. Repairs to leaking reservoirs.
  • Refurbishment of Nsami raw water pump station.